Six Week Basements
Framing and Rough Ins
The first step is the proper foundation. We hand pick our lumber, complete framing, install rough electrical, plumbing, hvac and finally the proper fireblocking. This Phase takes about 2 Weeks.
Insualtion and Drywall
This is the phase that defines the separation of rooms for most home owners. If any insulation is required in the walls or wanted in the ceiling, we install it at this time. We also cover the floor to minimize the mess drywall can create. This phase takes about 1 week.
1 of 2 Finish Phase
During part 1 of phase 2, we complete the finish electrical, tile and trim carpentry.
Phase 4 is part 2 of the finish phases
During this phase we paint drywall, doors, trim and shelving, set cabinets, complete plumbing and install carpet/wood/laminate flooring.
Personal Finishing Touches happens during part 2 of phase 4
Personal touches and extras determined along the way, happens during the final phase.
Travertine stone tile, has always been an elegant timeless look, you can keep forever.
Walk straight into your shower with the new drain systems. Add some stone for fun.
Add a wall of tile unlike the rest.
Converting a piece of furniture into a vanity is a fun and unique look.
Create a bathroom in your style and always enjoy it more!
A deep warm bath is always relaxing!
Above counter sinks come in may varities.
These are easily intregrated in a basement finish!